Cable laying in high-rise buildings in Nanjing

Share to:

Cable Conveyor Case Study: Cable Laying for a High-Rise Building’s Power System

Keepapexpower cable conveyors were used in the construction of the power system for a high-rise commercial complex. The project utilized keepapexpower cable conveyors to efficiently complete the laying operation:

Equipment Compatibility: Based on cable specifications (e.g., 10kV power cables, 25mm outer diameter, length exceeding 1000 meters), a conveyor with high traction and automatic tension adjustment was selected, along with a customized cable guiding device to ensure the cable did not slip or get damaged during transport.

Keepapexpower Cable Conveyor

Construction Efficiency: The conveyor operates at a speed of 26 meters per minute, significantly improving efficiency, and the fully automated control reduces the risk of human error.

Safety and Quality: The conveyor has a built-in tension monitoring system that provides real-time feedback on cable stress, preventing breakage or twisting; combined with cable guide wheels, it ensures accurate cable laying in complex paths (such as turns and conduits), ultimately achieving a 100% cable laying qualification rate, providing a fundamental guarantee for the stable operation of the complex’s power system.